Mira

 126,500 130,000

    Reset options

DELIVERY TIME ( Zainab Salman )
  • Pret or Casual would take a minimum of 3-4 weeks for delivery.
  • Luxury Pret or Semi Formal would take a minimum of 4-5 weeks for delivery.
  • Formal outfits would take a minimum of 1.5 to 2 Months for delivery.
  • Bridal outfits would take a minimum of 10-12 Weeks for delivery.
Add to wishlist Adding to wishlist Added to wishlist
SKUZSLP21-001 Category

Cherry red net lehenga saree worked in red thread and sequins all over with ruffle detailing. It has been paired with a cotton net blouse adorned with hand embellishments in gold and silver.

Details:

Cherry red net lehenga saree worked in red thread and sequins all over with ruffle detailing. It has been paired with a cotton net blouse adorned with hand embellishments in gold and silver.

Front depth: 8.5
Back depth: 9.5
Blouse Length: 14

Care Instructions:

Handle with care. Store in garment bag. Dry clean only.

Sizes

, , , , ,